For the service that IPCS is offering, it is worth mentioning the experience of their team in developing work, projects, shut down interventions and maintenance in the following clients

The IPC Specialists team boasts years of professional experience in project coordination across
different specialist areas, including direct participation in the following projects:

MODULAR CONSTRUCTION PROJECTS

CCR OL. USA (2.017/2.018)
Dimensions: 72 x 7,5 x 17 m
Weigh: 900 Ton
Estimated Manhours: 210.000 mh

URBASER (2.017)
Dimensions: 12,5 x 12 X 2,5 m h: 180 Ton
Weigh: 80 Ton
Estimated Manhours: 50.000 mh
(*) INCLUDES ALL ENGINEERING DEVELOPMENT.

CCR Alexandria (2.016/2.017)
Dimensions: 61 x 8,5 x 13 m
Weigh: 900 Ton
Estimated Manhours: 190.000 mh

Merox-T PEMEX (2.015/2.016)
Dimensions: 21 x 4 s 11 m + 3 x 4 x 26 m
Weigh: 180 Ton
Estimated Manhours: 80.000 mh
(*) INCLUDES ALL DETAILED ENGINEERING DEVELOPMENT.

Rec + PEMEX (2.011/2.012)
Dimensions: 25 x 10 x 12 m
Weigh: 400 Ton
Estimated Manhours: 80.000 mh

CCR PEMEX (2.011/2.012)
Dimensions: 96 x 8 x 17 m
Weigh: 1.300 Ton
Estimated Manhours: 210.000 mh

CCR Brazil (2.009)
Dimensions: 74 x 74 x 6 m
Weigh: 1.100 Ton
Estimated Manhours: 180.000 mh

MODULARIZATION of SC Biodiesel Process (2.012)

From zero (Basic Process) to Modular design.
Starting with detailed Process (P&ID)
and continuing with Equipment, Lay-Out (3D),
piping, structure, electricity, instrumentation, etc.

Getting final Modules definition,
prepared to constructive phase.

Scope variable, depending on the project. When needed, including local works, of-Module elements and Modular Construction of all activities (piping, structure, electricity, instrumentation, tracing, thermal insulation, etc.). Then Transport, Final Erection, Commissioning and Start-Up. All with the highest quality, adjusted price and tightest Schedule.
INDUSTRIAL PROJECTS IN OIL&GAS / CHEMICAL SECTOR

▸ Shut-Down REPSOL TGN (2018)
▸ Several projects Sabic Cargatena (2018)
▸ Shut-Down Dow Chemical (2017)
▸ Shut-Down Dow Chemical (2017)

▸ Projects Sabic Cartagena (2017)
▸ T-73 REPSOL TGN (2.016)
▸ Shut-Down REPSOL TGN (2016)
▸ Grounded pipes REPSOL TGN (2.015)

▸ Project Column for HPP unit in SABIC Cartagena (2.014)
▸ Platform Screen Dors <M> Barcelona (2.008-2.019)
▸ Revamp CADU II Cepsa Tenerife (2.009)
▸ Pla Tramuntana – ENDESA (2.008-2.010)

Scope variable, depending on the project.
In all cases: Organization and management of the execution with teams potentially in excess of 250 people at a single site. Special conditions of execution (typical of the sector. HSE, QA-QC, 24/7, etc.)